Supreme Compression Equal Tee 110mm PN16
Scale up your primary volumetric distribution loop with ultimate physical security using the industrial-grade Supreme Compression Equal Tee 110mm PN16. Specially engineered for absolute orthogonal mainline splitting on your highest-capacity lines, this heavy-duty equal-bore connector splits a 110mm primary supply pipeline into two identical 110mm distribution runs, providing total system stability across agricultural trunk lines, municipal water networks, and major civil irrigation projects.
Industrial Strength for High-Velocity Bulk Main Transmission Frameworks
Ultra-large 110mm pipe intersections face massive hydraulic tension and heavy pressure shocks from commercial pump cycles. This Supreme compression equal tee features a high-impact, virgin polypropylene copolymer body that effortlessly dampens sudden water hammer waves and absorbs heavy subterranean shifting loads. Fully UV-stabilised and chemical-resistant, it delivers a decades-long leakproof barrier whether buried deep or operating above ground.
Why This 110mm PN16 Supreme Equal Tee is the Engineering Benchmark:
- Full-Bore Symmetrical Division: Connects three identical lengths of 110mm MDPE or LDPE water supply pipelines with absolute mechanical alignment.
- Industrial Pressure Spec: Fully certified and rated to operate safely under demanding commercial environments up to PN16 (16 Bar / 232 PSI).
- High-Torque Clamping Mechanism: Ergonomically shaped interlocking caps ensure a completely secure mechanical lock using basic manual hand-tightening.
- Maximum Volumetric Throughput: Smooth internal wall engineering prevents friction loss and eliminates turbulence across the massive 3-way split.
Product Specifications:
- Brand: Supreme Irrigation (Italy)
- Manufacturer Part Number (MPN): S005110110
- Fitting Shape: 3-Way Equal Compression Tee
- Pipe Socket Compatibility: 110mm (All three mechanical ends)
- Pressure Rating: PN16 (Rated up to 16 Bar)
- Material Structure: High-grade UV-stabilised Polypropylene Copolymer (PP-B)
Assembly Advice from Our Engineering Team:
To guarantee a completely drip-free mechanical connection under continuous high line pressure, ensure all 110mm pipe ends are cut perfectly square and deburred before pushing them past the inner sealing rings. No specialist tools or messy glues are required on-site—simply firmly tighten the interlocking nuts by hand to keep the molded structural threads in flawless condition.

Reviews
There are no reviews yet.